construction plants for the chemical pharmaceutical industry

production of hydrogenators vertical vacuum cleaners industrial washers without detergent

production heat exchangers to tube bundle with surfaces up to 500 square meters A correct installation must be able to satisfy the followings conditions: - To make sure that the carrying structure is adequately dimensioned to bear the car under conditions of static / dynamic load - To fix the stirrups of support of the car to the carrying structure with connecting rods of fixing   aabbc11 - To guarantee the alignment between the nozzles of the car and the external pipelines of connection with the purpose to limit the mechanical tensions and the additional (to adopt possible joints of expansion) efforts. - up To make sure the mass to earth of the machine. - To make sure that all the safety devices and control necessary according to the normative existing in subject is present and working - To make sure that all the connections of the blender have been performed concerning itself to the list of the present connections on the sketch constructive ANGELO PILOTTA SRL N 05/5566 A-B. In the case of non connected services to verify that they comes flanged you blind.   aabbc12 . 1.4 obligations in case of ache operation or potential dangers The operators have the obligation to signal every possible deficiency or potential situation of danger that it had to be verified to their superior forehand. in case of malfunction of the machine, to verify the procedures brought in the various chapters.   aabbc13



txtb4 txtafter

ANGELO PILOTTA S.r.l. v. F.lli Cervi, 10 - 20017 Rho (Milano) - Italy - Phone+39-02/93909023 Fax+39-02/93901021 e-mail: info@pilottasrl.com